Stormwater Drainage and OSD Design Melbourne
ENGPRO Consulting Engineers designs stormwater drainage and on-site detention (OSD) systems for houses, dual occupancies, townhouses, apartments and commercial sites across Melbourne and Victoria. We prepare the drainage drawings and computations and deal with council engineers directly until the design is approved.
Service summary
- Stormwater drainage plans to AS/NZS 3500.3
- On-site detention and retention design to council requirements
- Pump systems for sites that fall away from the street
- Council liaison, site inspections and certification
What we design
New houses and extensions
We design the roof and surface water drainage from the building to the legal point of discharge nominated by council, including pipe sizes and grades, pits and levels.
Multi-dwelling developments
Dual occupancies, townhouses and apartments usually need a full drainage plan with on-site detention. We design the system and take it through council’s engineering department.
When you add hard surfaces
Extensions, new driveways, paving, sheds and pools increase the area that sheds water. Some councils ask for detention once the extra hard surface passes a set limit for the property.
On difficult sites
Blocks that fall to the rear, sites with no drainage easement, land in a flood overlay and proposals to build over an easement all need an engineered answer and the consent of council or the water authority.
What is on-site detention (OSD)?
New roofs and paving send water to the street faster than the old garden did. An on-site detention system holds that water on your property during a storm and lets it out slowly through a small outlet called an orifice, so the council drain is not overloaded.
The rate you are allowed to release is the permissible site discharge (PSD). Each council sets its own PSD, design storm and calculation method, so a design accepted by one council can be rejected by the next. We design to the rules of the council your site is in.
Detention or retention?
Detention slows water down and then empties. Retention keeps water for reuse in toilets, laundry or the garden. Many projects need both, and a single tank can often do both jobs.
Common OSD systems
- Above-ground tanks: a detention volume in a slimline or round tank, often combined with rainwater reuse.
- Underground tanks and pits: used where space is tight, usually under a driveway or courtyard.
- Oversized pipes: large pipes under a common driveway that store water along their length.
- Surface storage: shallow ponding in a driveway or landscaped basin, where council allows it.
We pick the system that suits your levels, your available space and the most economical option to build and maintain.
Stormwater design for architects, builders and homeowners
Architects and building designers
- Early advice on tank locations, levels and easements before town planning
- Drawings coordinated with your site and landscape plans
- Responses to council engineering referral comments
- One consultant for civil and structural engineering
Builders and developers
- Designs that are economical to build, with standard pits, pipes and tanks
- Drainage coordinated with our slab, footing and retaining wall designs
- Capacity for volume housing and multi-unit projects
- Inspections and certification of the installed system
Homeowners and owner-builders
- Plain-English advice on what council is asking for and why
- A fixed fee proposal before any work starts
- We speak to council engineers for you
- Drawings your plumber and builder can build from
How the process works
- Send us your plans. A site plan, the feature and level survey and the legal point of discharge report from council. If you do not have the LPD yet, we will tell you how to apply for it.
- Fee proposal. We confirm the scope, the council requirements and a fixed fee.
- Design. We prepare the drainage layout, detention computations and details.
- Council submission. We lodge the design where council approval is required and answer any requests for information.
- Approved drawings. You receive the approved plans for your builder and plumber.
- Inspection and certification. Where required, we inspect the installed system and certify it.
What you receive
- Stormwater drainage plan with pipe sizes, grades, pits and invert levels
- On-site detention computations and orifice details
- Tank, pit and pump details where required
- Design certification
What we need from you
- Architectural site plan and roof plan
- Feature and level survey
- Legal point of discharge report
- Any council engineering conditions for the site
Stormwater and OSD questions
What is a legal point of discharge?
The legal point of discharge (LPD) is the place council nominates for stormwater from your property to be released, such as the kerb and channel, a council drain or pit, or an easement drain. You apply to your council for an LPD report, and your stormwater design must connect to that point.
Does every new house need on-site detention?
No. It depends on your council, the size of the site, how much hard surface you are adding and the capacity of the drain in your street. Detention is common for dual occupancies, townhouses and apartments, and some councils also require it for single houses in certain catchments. We confirm this with council at the start of the design.
What if my block falls away from the street?
There are several options and council decides which it will accept: draining to an easement at the rear, a charged system for roof water, or a pump system with a storage pit. We assess your levels and design the option council will approve at the lowest build cost.
How much does a stormwater or OSD design cost?
The fee depends on the number of dwellings, the council, the site levels and whether a pump or underground tank is needed. Send us your plans and we will give you a fixed fee proposal. Your first 15 minute consultation is free.
How long does council approval take?
It varies from council to council. A complete submission that follows the council’s own guidelines attracts fewer requests for information, and that is the part we control.
Can you fix a design that council has rejected?
Yes. Send us the drawings and the council comments. We will review them, tell you what needs to change and resubmit.
Do you inspect and certify the installed system?
Yes. Where required, we inspect the installed drainage and detention system and issue certification that it matches the approved design.
Client testimonials
Owner's reply
Thank you for your kind words and for your continued trust in us. We greatly value our decade-long partnership and appreciate the opportunity to collaborate with you. Delivering high-quality, timely results is at the core of what we do, and it’s always a pleasure working with you. Looking forward to many more successful projects together!
Owner's reply
Thank you so much for your kind words and for taking the time to share your experience! we’re always here if you need any further support!
Discuss your project requirements
Send us your drawings or project brief and one of our engineers will respond with a fee proposal. Not sure what you need? Book a free 15 minute call with an engineer.